Week 15 — Final Project Demos¶
CEN207 Data Structures (formerly CE205) · Fall 2026–2027 · 25.12.2026
Each team demonstrates the Java implementation of the term project (RAP2) and submits the final report, presentation and video.
- Scope: F1–F9 (weeks 9–14) on top of the Java port of V1–V6 — see the Project Guide.
- Bring: Maven build from a clean clone, JUnit 5 with 100% coverage, JaCoCo and documentation reports, the GitHub release.
- Next: Quiz-2 (weeks 9–14) in the final exam period.
Demo checklist (local)¶
A private repository has no GitHub Pages site, so you show the project locally (details: Project Guide). What you open and show, in this order:
- The home page of the local site (
9-open-site-..., onhttp://localhost). - Each report page: tests, code coverage, documentation coverage (Windows and Linux).
- The API docs.
- The
release/folder listing. - Run the app from the release archive.
- The GitHub Release page of your private repository (the instructor is a collaborator).